Installing intake shaft (continued), Attach hopper – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1445 User Manual

Page 28

Advertising
background image

28 PNEG-1445 6", 8", 10" and 12" Custom Augers

4. Assembly

Installing Intake Shaft (Continued)

2. Next bolt the bearing with flangette to the studs on the hopper using the required lock washer and

nut.

(See Chart below

and

Figure 4AA.)

Figure 4AA

Attach Hopper

1. Slide the hopper onto the tube and align the end of the flight approximately 1/2" from the surface

of the bearing. With the proper distance set, install the proper bolt, lock washer and nut, and secure
the hopper to the tube.

(See Chart below

and

Figure 4AB.)

Figure 4AB

Hopper Bearing Nut

6"

5/16"-18 Hex Nut

8"

3/8"-16 Hex Nut

10"

1/2"-13 Hex Nut

Hopper Connecting Band Bolt

6" and 8"

5/16"-18 x 1" Hex Bolt

10"

5/16"-18 x 1-1/2" Hex Bolt

Advertising