0 installation, Front of pad – Alpha Technologies AlphaGen PN-6x-T 7.5kW 48Vdc User Manual

Page 30

Advertising
background image

30

042-288-B0-001, Rev. A2

3.0 Installation

3.1 Installing the CE-3x2 5K-T or PN-6x-T 7.5kW Pad Template

To ease the installation of the generator enclosure, use the pad mounting template to

accurately locate the mounting holes for the generator cabinet mounting hardware. The

installation instructions for the two types of generator pad templates are the same, only the

dimensions vary.

Site Considerations:

• Where possible, select a site that is above the 100-year flood plain, and away from

houses.

• Place in a shaded location to minimize the effects of solar loading.

• Avoid locating the enclosure where it will be an obstruction or inhibit visibility.

• Locate the enclosure away from sprinkler systems or other sources of forced water.

• Locate the enclosure out of the prevailing wind to minimize the buildup of snow or the

accumulation of wind-borne dust.

• Determine if soil conditions are suitable for the installation of the required grounding

system.

• Verify utility power cabling has been run and terminated at the site.

Front of Pad

38.00

.6

3

00

19.50 SYMM

.4

1

17

S

M

MY

C L

C L

2.25

86.

2

9.25 REF

1

.0

56

F

E

R

3

1

2

Fig.3-1, Pad Frame Template for CE-3x2 5K-T

(in inches)

Template frame

Threaded fasteners with “hex” spacers (4).

Insert mounting bolts into the threaded

fasteners to prevent concrete from fouling the

threads. Once the pad has cured, attach the

enclosure to the threaded fasteners.

Sweep compression plate. For the CE-

3x2, verify sweep is held in place against

the frame by the compression plate. For

the PN-6xT, verify the sweep retaining

bracket is located properly.

1

2

3

Advertising
This manual is related to the following products: