Enclosure front, 3 pn-6x-t 7.5kw installation, 0 installation, continued – Alpha Technologies AlphaGen PN-6x-T 7.5kW 48Vdc User Manual

Page 37

Advertising
background image

042-288-B0-001, Rev. A2

37

3.0

Installation, continued

3.3 PN-6x-T 7.5kW Installation

Prior to installation verify the following:
• All necessary grounding rods and materials are in place.
• Utility power run to site in accordance with the NESC (National Electric Safety Code).
• Obtained local safety practices for working with high-voltage systems.
• Gas piping, hardware, supports, and other gas carrying components to the pad location

conform to NFPA standard and local requirements.

Required Tools and Materials:
• Crane to lift enclosure from shipping pallet and place on pad
• Key(s) to enclosure doors
• Digital voltmeter
• Torque wrench with insulated handle and 1/2" socket
• 1/2" box-end wrench
• NO-OX or other suitable corrosion inhibiting agent (NCP-2)
• Silicone sealant GE RTV123 (or equivalent)
• Phillips screwdriver (for pad shear mounting)
• 5/8" socket for removing pallet mounting bolts
• Hard hats
• Utility knife

Fig. 3-8, PN-6x-T 7.5kW Sweep Dimensions (in inches)

MOUNTING STUD POSITION

O

0.625 x 1.000 4 PL

ENCLOSURE

FRONT

26.00

O

0.875

GROUND SWEEP

O

3.000

DC SWEEP

O

1.375

AC SWEEP

0.25

3.00

5.35

5.60

7.60

0.581

3.40

Advertising
This manual is related to the following products: