7.0

Maintenance, continued
7.8

Fuel Conversion, Natural Gas to LP, continued

7.8.3 Switching the NG Port to the LP Port, CE-3X2

The following procedure must only be performed by qualified personnel. To prevent

injury, disable generator and disconnect gas supply prior to beginning the gas conversion

procedure.

WARNING!

Required Tools:

• 7/8" open-end wrench

• NFPA-approved pipe sealant

• 1/4" Allen wrench

• Flathead screwdriver

In this procedure, the gas inlet hose is switched from the NG port to the LP port.

Reverse this process if converting from liquid propane to natural gas.

1. Locate the Loosen the hose clamp on the gas line (1).

2. Holding the gas hose, loosen the gas fitting from the NG port (2).

3. Using the 1/4" Allen wrench, remove the plug from the LP port. Coat the plug

with pipe sealant and reinstall in the NG port (3).

4. Coat all but last two threads of the gas fitting and install in the LP port (4).

5. Set the selector switch on the Gas Hazard Sensor to the correct setting

.

6. Apply gas pressure, and test all fittings for leaks with test solution or soapy

water. Clean and dry fittings after leak testing to avoid rust.