5.3 Performing a Local APU Test

Procedure:

1. Locate the ECM and set the Run/Auto/Stop (RAS) switch to the STOP position.

2. Verify ignition battery and AC line sense connection to ECM.

3. Verify all alarms on ECM are OFF, except Tamper Alarm & Auto Mode Disabled.

4. Remove gas port plug from input side of demand regulator, install brass manometer port

connection fitting and connect manometer to fitting (see Section 7-9 for details).

5. Move the RAS

switch from Stop to Auto.

6. Verify the engine starts within 9 crank cycles. If engine fails to start within 9 crank cycles

and Engine Over-crank

is activated, the gas line needs to be purged by removing the

air filter and placing your hand over the carburetor throat and cranking the engine until it

starts.

7. Verify 11" of water column pressure is present at the input of the demand regulator.

8. If necessary, adjust the pre-regulator or dual regulator (located on gas bottle assembly for

propane) by removing regulator cap and adjusting for 11" ± 1" of water column pressure.

Perform under NO-LOAD condition (see Section 7.9 for details).

9. Set RAS switch to Stop.

10. Remove brass manometer fitting and reinstall plug to demand regulator input monitoring

port using approved pipe sealant.

11. Check demand regulator input monitoring port for leaks.

12. Set RAS to Auto.

The Generator Control Board master switch will override the Run/Auto/Stop (RAS) switch on the ECM. This

switch defaults to the center (ECM) position.

NOTE:

Advertising
This manual is related to the following products: