CEMB USA ER100-i (B) User Manual
Page 11
Advertising

11
16
25Nm
15
17
17
Use and Maintenance Manual Rev. 12-2012
ENGLISH
Installation
15. Drill the holes in the floor using a drill with an 8Ø bit and fit the expandable bolts provided as indicated in the
drawing and tighten them to a torque of 25 Nm. As indicated in the box, in the last phase, fasten the mounting
brackets on the side of the column and tighten to a torque of 25Nm (15) .
16. Check that the mains input voltage and frequency
parameters are compatible with the data shown on
the wheel balancing machine plate (±10%) (16).
17. Check proper pneumatic connection; the machine and
the lift require at least 8 kg/cm² (~ 0.8 MPa; ~8 BAR;
~115 PSI) (17).
18. Turn on the machine and carry out the following
operations:
▪
LASER CALIBRATION
▪
▪
Advertising