Installation 8, Installation – CEMB USA ER100-i (B) User Manual

Page 8

Advertising
background image

8

4

2

3

1

Use and Maintenance Manual Rev. 12-2012

ENGLISH

2. Installation

1. Unpack the machine and place the front guard on the

ground with the spindle locking/release pedal, the Zero

Weight lift and the side guard (1).

3. Do not install the machine in an area directly exposed

to sunlight or where there are reflections from the floor.

The machine might malfunction if there is excess light

(3).

2. Absolutely do not force the side column when unloading

the machine from the pallet and be careful with the

electrical wiring (2).

Installation

4. Avoid positioning objects made of a particularly reflecting

material in the areas indicated in gray, as they might

interfere with laser reading (4).

Advertising