Lc series startup form – AAON LC-054 User Manual

Page 45

Advertising
background image

45

LC Series Startup Form

Job Name:_______________________________________________

Date:______________

Address:______________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________ Tag:_______________
Startup Contractor:______________________________________________________________
Address:______________________________________________________________________
_______________________________________________________

Phone:______________

Pre Startup Checklist
Installing contractor should verify the following items.

1. Is there any visible shipping damage?

Yes No

2. Is the unit level?

Yes No

3. Are the unit clearances adequate for service and operation?

Yes No

4. Do all access doors open freely and are the handles operational?

Yes No

5. Have all shipping braces been removed?

Yes No

6. Have all electrical connections been tested for tightness?

Yes No

7. Does the electrical service correspond to the unit nameplate?

Yes No

8. On 208/230V units, has transformer tap been checked?

Yes No

9. Has overcurrent protection been installed to match the unit nameplate

requirement?

Yes No

10. Have all set screws on the fans been tightened?

Yes No

11. Do all fans rotate freely?

Yes No

12. Does the field water piping to the unit appear to be correct per design

parameters?

Yes No

Ambient Temperature

Ambient Dry Bulb Temperature ________°F

Ambient Wet Bulb Temperature ________°F

Advertising
This manual is related to the following products: