5 reagents installation – Hach-Lange POLYMETRON 9245 User Manual User Manual
Page 45
Advertising
43
Installation
4.4.5 Reagents installation
1.
Prepare the reagents according to
Reagent Preparation on page 115
. Install the reagent
canisters in their place and connect them to their respective tubes.
2.
Install and connect the conditioning solution (diisopropylamine). The diagrams show an
analyzer for non-cationic applications. Analyzers for cationic applications have a small pump
installed above and to the left of the reagent canisters.
3.
Install and connect the reactivation
solution (blue R label).
4.
If you have this option, install and connect
the auto calibration solution (yellow CAL
label).
Advertising