Section 9 maintenance and diagnostics, 1 maintenance schedule, 2 battery replacement – Hach-Lange POLYMETRON 9245 User Manual User Manual

Page 95: 1 maintenance schedule 9.2 battery replacement

Advertising
background image

93

Section 9

Maintenance and Diagnostics

Periodic maintenance will ensure accurate and consistent analysis results. Verify the levels of
the calibration solution and reagents and refill where necessary.

9.1 Maintenance schedule

The following table shows the suggested maintenance schedule for the 9245 Sodium Analyzer.
Selection of parts for preventive maintenance is detailed in

Accessories - Options - Maintenance

kits on page 107

.

9.2 Battery replacement

The transmitter is delivered with a CR1220 (3V) lithium battery included to safeguard the time
function in the instrument when not powered up. Should this internal battery malfunction or
require replacement it must be replaced with exactly the same battery type CR1220 (3V) UL
Certified (compulsory VARTA, RENATA or MATSUSHITA).

Table 9 Maintenance schedule

Daily

Weekly

Monthly

Every 3
Months

Every 6
Months

Yearly

Every 2

Years

As

Needed

Verification

X

X

X

Calibration

X

X

Electrode reactivation

X

X

Temperature calibration

X

X

Refill calibration solution

X

X

Refill reactivation solution

X

X

Refill electrolyte solution

X

X

Electrodes manual cleaning
(with paper/tissue)

X

X

Conditioning solution
(non-cationic applications)

X

X

Conditioning solution
(cationic applications)

Refer to

DIPA consumption on page 23

for an indication on

how often the conditioning solution will need to be changed.

X

Solenoid valves

X

X

The following items are performed by the Hach Lange service group

System check-up

X

External audit

X

WARNING

There is a risk of explosion if the replacement battery does not correspond to the correct
model as indicated above. Do not throw away used batteries, but send them to a local
recycling center.

Advertising