Nova-Tech LMI Series AA-B-C-E-J-P Metering Pumps User Manual

Page 21

Advertising
background image

21

4.8

Injection Check Valve and

Discharge Tubing Installation

A. Installing Injection Check Valve (Figure 1)

1. The Injection Check Valve prevents backflow from a treated line. Install the

injection check valve at the location where chemical is being injected into the

system.

2. Any size Female NPT fitting or pipe tee with a reducing bushing to ½"

Female NPT will accept the injection check valve. PTFE tape should only be

used on threads that are connected with pipes.

3. When installing the Injection Check Valve, be sure to position it so that the

valve enters the bottom of your pipe in a vertical position. Variations 40° left

and right are acceptable.

B. Connecting Discharge Tubing

Note: Cut tubing to length needed for discharge line.
1. Route tubing from the injection check valve to the metering pump, making

sure it does not touch hot or sharp surfaces, or is bent so sharply that it kinks.

2. Reference 4.3 Tubing Connections.

FIGURE 1

Advertising