Nova-Tech LMI Series AA-B-C-E-J-P Metering Pumps User Manual

Page 36

Advertising
background image

36

CAUTION

!

9.3

Cartridge Valves, Seal Rings/Valve Balls and

Injection Check Valve Spring Replacement



ALWAYS wear protective clothing, face shield, safety glasses

and gloves when working on or performing any maintenance

or replacement on your pump. See MSDS information from

solution supplier for additional precautions.


1. Refer to the LMI Metering Pump Price List for the proper

Spare Parts Kit or RPM Pro Pac

kit number or contact your

local LMI stocking distributor.

2. Carefully depressurize and disconnect the discharge line

(see Section 9.1 in this manual). Place the Foot Valve into

a container of water or other neutralizing solution. Turn the

pump on to flush the head assembly. Once the pump has

been flushed, lift the Foot Valve out and continue to pump

to let air into the pump head until pump is purged of water

or neutralizing solution.

Once the pump has been flushed, lift the Foot Valve out and

continue to let air into the pump head until pump is purged

of water or neutralizing solution.

If the liquid cannot be pumped due to Liquifram

rupture,

with protective clothing, gloves and face shield, carefully

disconnect the tubing and four screws to remove the head.

Immerse the head in water or other neutralizing solution.

Spare part replacement kits include specific instructions for

valve replacement. Please follow the instructions included

with the replacement kit.

IMPORTANT:Beforedisassemblingthecheckvalves,note

theorientationofthevalve.

3. Carefully disconnect one tubing connection and fitting at a

time, then remove and replace the worn valve.

If necessary, carefully loosen stuck valves by prying side

to side using a small screwdriver through the center hole of

the valve.

4. Install new check valves in each location.

CAUTION

!

Advertising