Nova-Tech LMI Series AA-B-C-E-J-P Metering Pumps User Manual

Page 3

Advertising
background image

3

Contents

1.0 Introduction .........................................................................................4

1.1 Spare Parts ..............................................................................4

2.0 Unpacking Check List ........................................................................6
3.0 Pre-Installation Instructions .................................................................8
4.0 Installation ......................................................................................... 10

4.1 Pump Location and Installation ............................................. 10

4.2 Pump Mounting ..................................................................... 10

4.3 Tubing Connections ............................................................... 15

4.4 Multi-Function Valves ............................................................. 16

4.5 4-Function Valve Installation .................................................. 18

4.6 AutoPrime Liquid End ............................................................ 19

4.7 Foot Valve/Suction Tubing Installation ...................................20

4.8 Injection Check Valve and Discharge Tubing Installation .......21

5.0 Liquid End Parts List ........................................................................22
6.0 Start-Up and Adjustment...................................................................23

6.1 Output Adjustment Controls ..................................................23

6.2 Start-Up/Priming for Pump Supplied with

Multi-Function Valve ..............................................................24

6.3 Start-Up/Priming without Multi-Function Valve ......................25

6.4 Output Adjustment .................................................................26

6.5 Total Pump Output ................................................................26

7.0 Methods of External Triggering or Pacing

B7, C7 and P7 Pumps .................................................................28, 29

8.0 Calibration .........................................................................................30

8.1 Pressure Control ....................................................................31

8.2 Calibration Procedure - On-Site

Volumetric Calibration in External Mode ...............................32

9.0 Spare Parts Replacement/Routine Maintenance ..............................32

9.1 Depressurizing the Discharge Line

(For Pumps Equipped with a 3-FV or a 4-FV Only) ...............32

9.2 Liquifram

(Diaphragm) Replacement ..................................33

9.3 Cartridge Valves, Seal Rings/Valve Balls and Injection

Check Valve Spring Replacement .........................................36

10.0 Checking Pump for Proper Zero Position (Stroke Knob) ...................37

10.1 Type I: Push-on Knob ............................................................37

11.0 Troubleshooting.................................................................................40
12.0 EPU Resistance Chart ........................................................Back Cover

Advertising