3 changing the process connection, Changing the process connection -2 – Yokogawa EJX930A User Manual

Page 31

Advertising
background image

<5. Installation>

5-2

IM 01C25R01-01E

Vertical pipe mounting

(Process connector upside)

Vertical pipe mounting

(Process connector downside)

Transmitter

mounting bolt

Transmitter

mounting bolt

Mounting bracket

Mounting bracket

U-bolt nut

U-bolt nut

U-bolt

U-bolt

50 mm(2-inch) pipe

50 mm(2-inch) pipe

F0503.ai

Figure 5.3

Transmitter Mounting (Vertical Impulse

Piping Type)

5.3 Changing the Process

Connection

The transmitter is shipped with the process

connection specifi ed at the time of ordering. To

change the process connection, the drain (vent)

plug must be repositioned.
To reposition a drain (vent) plug, use a wrench to

slowly and gently unscrew it. Then, remove and

remount it on the opposite side. Wrap sealing tape

around the drain (vent) plug threads (*1 in the fi gure

below), and apply a lubricant to the threads of the

drain (vent) screw(s) (*2 below). To tighten the drain

(vent) plugs, apply a torque of 34 to 39 N·m {3.5 to 4

kgf·m}. Process connector bolts are to be tightened

uniformly to a torque of 39 to 49 N·m {4 to 5 kgf·m}.

F0504.ai

*1
*2

Drain/vent plug

Note: For a horizontal impulse

piping type, moving the

process connectors from

the front side to the

back is not allowed.

Vertical impulse piping type Horizontal impulse piping type

Bolt

Process

connector

gasket

Figure 5.4

Changing Process Connection