5 use of a transceiver, 1 insulation resistance test procedure, Use of a transceiver -2 – Yokogawa YTA320 User Manual

Page 8: Insulation resistance test procedure -2

Advertising
background image

<2. Notes on Handling>

2-2

IM 01C50B01-01E

(3) Impact and Vibration
It is recommended that the instrument be installed

in a location that is subject to a minimum amount of

impact and vibration.

2.5 Use of a Transceiver

Although the temperature transmitter is designed to

resist influence from high frequency noise; use of a

transceiver in the vicinity of installation may cause

problems. Installing the transmitter in an area free

from high frequency noise (RFI) is recommended.

2.6 Insulation Resistance Test

and Withstand Voltage Test

CAUTION

(1) Overvoltage of the test voltage that is so

small that it does not cause an dielectric

breakdown may in fact deteriorate insulation

and lower the safety performance; to prevent

this it is recommended that the amount of

testing be kept to a minimum.

(2) The voltage for the insulation resistance

test must be 500 VAC or lower, and the

voltage for the withstand voltage test must

be 500 VAC or lower. Failure to heed these

guidelines may cause faulty operation.

(3) Where a built-in arrester is provided (suffix

code: /A), the voltage for the insulation

resistance test must be 100 VDC or lower,

and the voltage for the withstand voltage test

must be 100 VAC or lower. Failure to heed

these guidelines may cause faulty operation.

Follow the steps below to perform the test, the

wiring of the transmission line must be removed

before initiating testing.

2.6. Insulation resistance test procedure

Testing between the output terminal and

input terminal

1. Lay transition wiring between the + terminal,

the – terminal, and the check terminal of the

terminal box.

2. Lay wiring across terminals 1, 2, 3, and 4 of the

terminal box.

3. Connect the insulation resistance meter (with

the power turned OFF) between the transition

wiring of Steps 1 and 2 above. The polarity of

the input terminals must be positive and that of

the output terminals must be negative.

4. Turn the power of the insulation resistance

meter ON and measure the insulation

resistance. The duration of the applied voltage

must be the period during which 100MΩ

or more is confirmed (or 20MΩ if the unit is

equipped with a built-in arrester).

5. Upon completion of the test, remove the

insulation resistance meter, connect a 100KΩ

resistor between the transition wiring, and

allow the electricity to discharge. Do not

touch the terminal with your bare hands while

the electricity is discharging for more than 1

second.

Testing between the output terminal and

grounding terminal

1. Lay transition wiring between the + terminal,

the - terminal, and the check terminal of the

terminal box, then connect an insulation

resistance meter (with the power turned OFF)

between the transition wiring and the grounding

terminal. The polarity of the transition wiring

must be positive and that of the grounding

terminal must be negative.

2. Turn the power of the insulation resistance

meter ON and measure the insulation

resistance. The duration of the applied voltage

must be the period during which 100MΩ

or more is confirmed (or 20MΩ if the unit is

equipped with a built-in arrester).

3. Upon completion of the test, remove the

insulation resistance meter, connect a 100KΩ

resistor between the transition wiring and the

grounding terminal, and allow the electricity to

discharge. Do not touch the terminal with your

bare hands while the electricity is discharging

for more than 1 second.

Testing between the input terminal and

grounding terminal

1. Lay transition wiring between terminals 1, 2,

3, 4 and 5 of the terminal box, and connect the

insulation resistor (with the power turned OFF)

between the transition wiring and the grounding

terminal. The polarity of the transition wiring

must be positive and that of the grounding

terminal must be negative.

2. Turn the power of the insulation resistance

meter ON and measure the insulation

resistance. The duration of the applied voltage

must be the period during which 100MΩ

Advertising
This manual is related to the following products: