A.O. Smith VB/VW- 1000 User Manual

Page 6

Advertising
background image

6

This design complies with the current edition of the ANSI

Z21.13 low-pressure boiler standard.
Compliance under this standard implies that when the boiler

underwent test, the gas manifold and control assembly pro vided

on the boiler met safe lighting and other performance criteria.
Detailed installation diagrams are found in this manual. These

diagrams will serve to provide the installer a reference for the

materials and methods of piping necessary. It is essential that

all water, gas piping and wiring be installed as shown on the

diagrams. You should thoroughly read and understand this

manual before installation and/or operation of this boiler.
The factory warranty will be void if the boiler(s) have been

improperly installed or operated.

AL 29-4C

®

is a registered trademark of Allegheny Ludlum

Corporation.
In addition to these instructions, the boiler(s) shall be installed in

accordance with those installation regulations in force in the local

area where the installation is to be made. These shall be carefully

followed in all cases. Authorities having jurisdiction should be

consulted before installations are made.
In the absence of local codes, the installation must comply with

the current editions, as follows:
In the United States:

The National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the

National Electric Code, NFPA 70.

CONTENTS

INTRODUCTION

SAFE INSTALLATION, USE AND SERVICE ...........................................2

GENERAL SAFETY......................................................................................3

DIMENSION AND CAPACITY DATA .........................................................4

CAPACITY AND FLOW DATA ....................................................................5

CONTENTS ...................................................................................................6

INTRODUCTION ...........................................................................................6

Grounding Instructions .............................................................................7

Inlet Water Considerations ......................................................................7

Correct Gas ..............................................................................................7

Precautions ...............................................................................................7

Liquefied Petroleum Gas Models ..........................................................7

High Altitude Installations ........................................................................7

Field Installed Components ....................................................................7

CONTROL COMPONENTS .........................................................................8

The Control System ................................................................................8

Hot Surface Igniter ..................................................................................8

Pressure Switches ...................................................................................8

Low Gas Switch ......................................................................................8

Water Flow Switch ..................................................................................8

Flame Sensor ...........................................................................................8

Water Temperature Limit Controls .........................................................9

ON/OFF Switch ........................................................................................9

Circulating Pump ......................................................................................9

Temperature Probes ................................................................................9

Low Water Cutoff (Optional) ..................................................................9

Pressure Relief Valve ..............................................................................9

GENERAL ....................................................................................................10

Required Ability ......................................................................................10

Location ...................................................................................................10

Panels and Covers ................................................................................10

Chemical Vapor Corrosion .................................................................... 11

Installtion Clearances ............................................................................. 11

Leveling ................................................................................................... 11

Air Requirements ................................................................................... 11

Unconfined Space .................................................................................. 11

Confined Space ..................................................................................... 11

Fresh Air Openings for Confined Spaces .......................................... 11

Outdoor Air Through Two Openings ...................................................12

Outdoor Air Through One Opening ....................................................12

Outdoor Air Through Two Horizontal Ducts .......................................12

Outdoor Air Through Two Vertical Ducts ...........................................12

Air From Other Indoor Spaces............................................................13

Termination Clearances Sidewall Power Vent ...................................14

Termination Clearances Sidewall Direct Vent ....................................15

VENTING .....................................................................................................16

Special Installation Considerations .......................................................16

Venting System Using AL 29-4C

®

.......................................................16

General Exhaust Vent Installation Procedure ....................................16

Connecting Vent to Boiler ....................................................................16

Venting Supports ....................................................................................17

Vertical Installation Requirements ........................................................17

Horizontal Installtion Requirements ......................................................17

Direct Vent Installation Requirements .................................................19

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF

MASSACHUSETTS .....................................................................................19

SYSTEM INSTALLATION ..........................................................................22

General ....................................................................................................22

Hot Water Heating (Hydronic) Equipment ..........................................22

Internal Contaminants ............................................................................23

Hot Water Supply Boiler System - General Water Line Connections ...23

Hard Water Conditions ..........................................................................23

Thermal Expansion (Closed System) ..................................................23

Remote Probe Installation Procedure .................................................23

Gas Connections ...................................................................................24

Gas Supply Line Sizing ........................................................................24

Wiring ......................................................................................................28

SUGGESTED PIPE SIZING TABLES .....................................................29

WIRING DIAGRAM ....................................................................................30

VB/VW-500, 750 & 1000 SCHEMATIC DIAGRAM ...............................32

OPERATION ................................................................................................33

Important .................................................................................................33

General ....................................................................................................33

Filling and Purging of Heating Boiler Installation..............................33

Filling Hot Water Supply Boiler Installation .......................................33

Purging Gas Line ..................................................................................33

Inlet Gas Pressure ................................................................................33

Water Temperature Regulation .............................................................34

LIGHTING & OPERATION INSTRUCTIONS ..........................................36

Adjustment ..............................................................................................37

Setting of the Test Mode .....................................................................37

Control System .......................................................................................37

Inputs to MCB .......................................................................................38

Operating Sequence ..............................................................................39

UIM Operating Procedures ...................................................................40

Operating Setpoint Adjustment Procedure ..........................................41

High Limit Differential Setpoint Adjustment Procedure .....................42

TROUBLESHOOTING IGNITION SYSTEM ............................................44

Troubleshooting Gas Valve ...................................................................45

Main Burner ............................................................................................45

PREVENTATIVE MAINTENANCE .............................................................45

Relief Valve ............................................................................................46

Combustion Air Filter .............................................................................46

Blower Compartment .............................................................................46

Burner Maintenance ...............................................................................46

Condensate Removal System ..............................................................46

Venting Maintenance .............................................................................47

Heat Exchanger Preventative Maintenance ........................................47

Deliming ..................................................................................................47

Tube Cleaning Procedure Mechanical Removal of Deposits ..........47

Replacement Parts ................................................................................47

NOTES .........................................................................................................48

LIMITED WARRANTY ................................................................................51

Advertising
This manual is related to the following products: