KROHNE BM 100A Handbook User Manual
Page 11
Advertising
Handbook BM 100 A
11
Process connection and entry pipe
Caution:
Do not put the nozzle close to the entry pipe. Pouring the product directly onto the
probe will give false readings. Install deflector plate if impossible to distance gauge
from entry pipe.
Stilling wells
Tanks with floating roofs for petro-chemical applications: Use a stilling well.
1
2
Stilling well
Tank
3 Floating
roof
4
Product (petroleum applications)
5
Well fixed to tank base (no roof
deformation)
6 Sediment
Advertising