KROHNE BM 100A Handbook User Manual

Page 11

Advertising
background image


Handbook BM 100 A

11


Process connection and entry pipe


Caution:

Do not put the nozzle close to the entry pipe. Pouring the product directly onto the
probe will give false readings. Install deflector plate if impossible to distance gauge
from entry pipe.



Stilling wells

Tanks with floating roofs for petro-chemical applications: Use a stilling well.

1


2

Stilling well


Tank

3 Floating

roof


4

Product (petroleum applications)

5

Well fixed to tank base (no roof
deformation)

6 Sediment

Advertising