HP XP7 Storage User Manual

Page 320

Advertising
background image

Message ID

Message Text

Explanation

target HBA port WWN. After that,

specify the appropriate HBA port

WWN, and then retry.

KAPL01102-I

All the paths which pass the

specified aa...aa port will be

changed to the Offline(C)

status. Is this OK? [y/n]:

Details

Multiple paths will be collectively

placed Offline(C) because the -
hbaportwwn parameter was

specified. To collectively place

multiple paths Offline(C), enter y.

To not collectively place them

Offline(C), enter n.
aa...aa: HBA

Action

If you want to execute the offline

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01103-I

If you are sure that there would

be no problem when all the

paths which pass the specified

aa...aa port are placed in the

Offline(C) status, enter y.

Otherwise, enter n. [y/n]:

Details

This message re-asks the user

whether to place all the paths

Offline(C). To place all the paths

Offline(C), enter y. To not place

them Offline(C), enter n.
aa...aa: HBA

Action

If you want to execute the offline

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01104-I

All the paths which pass the

specified aa...aa port will be

changed to the Online status. Is

this OK? [y/n]:

Details

Multiple paths will be collectively

placed Online because the -
hbaportwwn parameter was

specified. To collectively place

multiple paths Online, enter y. To

not collectively place them Online,

enter n.
aa...aa: HBA

Action

If you want to execute the online

processing for the paths which

pass the specified target, enter y.

If you want to terminate the

processing, enter n.

KAPL01106-W One or more connected storage

system cannot use the load

balancing function.

Action

None.

8-22

Messages

Hitachi Dynamic Link Manager (for Windows®) User Guide

Advertising
This manual is related to the following products: