The online path statuses -21 – HP XP7 Storage User Manual

Page 41

Advertising
background image

The Online Path Statuses

The online path statuses are as follows:

Online
I/Os can be issued normally.

Online(P)
A state in which a path in the Online status is in the waiting-to-execute

status to be taken offline.
This status occurs in a cluster configuration only.
The Online(P) status indicates that the user has requested an Online

path to be taken offline, for a path that is connected to an LU that is

currently performing reserve processing. I/O operations can still be issued

normally until the reserve processing on the LU finishes. After the reserve

processing finishes, the offline operation request will be performed and

the path status will become Offline(C).
The (P) means pending, which indicates that the operation to take the

path offline is in the waiting-to-execute status (i.e. a request has been

made).

Online(E)
An error has occurred on the path, but none of the other paths that

access the same LU are in the Online status.
If none of the paths accessing a particular LU are in the Online status,

one of the paths is changed to the Online(E) status. This ensures that

the LU can be accessed through at least one path.
The (E) means error, which indicates that an error has occurred on the

path from some previous operation.

Online(EP)
The status of an Offline(P) path changes to Online(EP) when the path

goes through the following process during reserve processing in a cluster

configuration:

a

.

When exactly two paths are connected to an LU and the user performs

an offline operation on the Offline(E) path to change it to
Offline(P) and the other path is Online(E).

b

.

When one path is Offline(P), the other path must be Online(E). If

HDLM detects an error in the Online(E) path, then the path statuses

will change as follows:
The Online(E) path changes to Offline(E).
The Offline(P) path changes to Online(EP).

If the reserve processing finishes after the path has changed from
Online(EP) to Offline(P), the offline operation will end successfully and

the path will change to Offline(C).
If the reserve processing finishes while the path is Online(EP), the offline

operation will fail and the path will change to Online(E).

Online(S)

#

HDLM Functions

2-21

Hitachi Dynamic Link Manager (for Windows®) User Guide

Advertising
This manual is related to the following products: