HP Tower Uninterruptible Power System User Manual
Page 58
Advertising

Configuration and operation 58
To copy a configured action:
1.
Select the action, and then click Copy selected action. The Copy this action screen appears.
2.
Enter a name for the action in the Action name field.
3.
Click Save.
To edit a configured action:
1.
Double-click the action, or select the action, and then click Edit selected action. The Edit action screen
appears.
2.
Modify the information as necessary.
3.
Click Save.
To test a configured action, select the action, and then click Test selected action. The selected action is
performed, allowing you to test the behavior.
To remove a configured action, select the action, and then click Remove selected action.
Click Help to view online help.
Advertising