UPS installation 28

Top entry

Use a Greenlee punch to provide one or more holes in the top of the wireway. Install one or more holes in

the center rear of the top of the racks.

NOTE:

Top entry wiring does not interfere with access areas for the fans, connectors, breakers

or X-Slot cards on any HP 3 Phase UPS. See the wireway label.

Wiring the terminal block

Connect the input, output and ground wires to the Power Bus Bar terminal block. Route the three input phases
and the input neutral through the ferrite assembly.

Wire gauge depends on overcurrent protection rating required. For more information, see "Installing in a

parallel configuration (on page

26

)." Reference the NEC, NFPA 70, for wire sizing.