Preparing the rails for integrated shipping – HP Parallel Uninterruptible Power System User Manual

Page 58

Advertising
background image

ERM installation 58

4.

Insert screws through the mounting rail into the cage nuts or clip nuts.

5.

Tighten the wing nuts or hex nuts.

Preparing the rails for integrated shipping

If the unit is to be shipped in a rack:

1.

Remove the hex nuts from the mounting rail.

2.

Install the rail reinforcement plates and tighten using the hex nuts with captive washers, included in the
kit, instead of the nuts included with the rail.

Advertising