JKS 2943 User Manual

Page 5

Advertising
background image

JKS2943

JKS Adjustable Sway Bar Links Installation

Page 5



Using the value provided by the formula above,

mark each end of the Connecting Rod (A) to

indicate the appropriate locations to cut.

HINT:

Remove same amount of thread material from

each end.



Using an appropriate cutting tool (such as a die

grinder with cutting wheel, or metal cutting saw),

carefully and squarely cut each end of the Con-

necting Rod (A) where previously marked.



Now completely unthread both 1/2” Jam Nuts (C)

from Connecting Rod (A) and re-install. HINT: This

will help to repair any thread damage that may

have occurred during the cutting process.



Apply a drop of medium strength thread locking

compound to the tip of threads at each end of

Connecting Rod (A).



Completely thread a Rod End (B) on to each end

of Connecting Rod.

‰

4. INSTALL END LINKS



If you are installing this product on a Rubicon

model with electronic front swaybar disconnect,

you must now enlarge the mounting holes on the

swaybar using a 17/32” drill bit.



Using the supplied 1/2” Flanged Locking Nuts (D),

secure the Adjustable End Links to the swaybar

and axle bracket. Make sure upper and lower Rod

Ends (B) are in alignment with their respective

mounting surfaces.

IMPORTANT: End Links must be installed on

outboard side of swaybar and inboard side of axle

bracket.



Once all adjustments are complete, fully tighten

the Jam Nuts (C) against the Rod Ends (B) to pre-

vent length of Adjustable End Links from changing.



Tighten the 1/2” Flanged Locking Nuts (D) to 40

ft-lbs. using a torque wrench.

HINT: Use flat spot on Rod Ends (B) to prevent

mounting stud from spinning when tightening 1/2”

Flanged Locking Nut (D).

©2013 JKS Manufacturing, Inc & Aftermarketing, LLC

Revision Date 9/30/2013

Advertising