5 solar panel, Solar panel – Campbell Scientific UT10 10 foot Tower w/ Grounding Kit and Hinged Base User Manual

Page 29

Advertising
background image

UT10 Weather Station

2. Make sure the red and black wires attached to the “+12 V” and “ ”

terminals on the PS100 are connected to the “12 V” and “G” terminals on

the CR1000 Wiring Panel.

3. An AC transformer or unregulated solar panel (Section 8.1.5, Solar Panel)

should be connected to the PS100 at all times. Connect the lead wires

from the transformer or solar panel without regard to polarity to the two

terminals labeled “CHG” (FIGURE 8-4); the red LED should light when

voltage is present.

The wall transformer converts 120 Vac input to 18 Vac output.

Maximum charging current is 1.1 A.


Maximum input voltage into the “CHG” terminals is 26

Vac or 26 Vdc. Do not connect 110 Vac directly to

“CHG” terminals.

4. Turn power switch to “ON”, and replace cover.

8.1.5 Solar Panel

Solar panels purchased from Campbell Scientific are shipped with a charge

plug taped to the back of the panel. The charge plug is not used with the

PS100. Refer to the solar panel manual for installation instructions.

1. Mount the solar panel to the mast, facing south (northern hemisphere).

Position the solar panel at the top of the 1 1/4 inch diameter section of the

mast. Install using its mounting hardware (see FIGURE 8-5).

2. The solar panel should be oriented to receive maximum insolation over the

course of the year. Suggested tilt angles (referenced to the horizontal

plane) are listed below.

Site Latitude

Tilt Angle

0 - 10 degrees

10 degrees

11 - 20

Latitude + 5 degrees

21 - 45

Latitude + 10 degrees

46 - 65

Latitude + 15 degrees

> 65

80 degrees

3. After determining the tilt angle, loosen the two bolts that attach the

mounting bracket to the panel. Adjust the angle, then tighten the bolts.

Secure the lead wire to the mast using wire ties.