Installation

2. Build a dam around the foundation.
3. Thoroughly wet the foundation that will come into contact with the grout.
4. Pour grout through the grout hole into the baseplate up to the level of the dam.

When you pour the grout, remove air bubbles from it by using one of these methods:

• Puddle with a vibrator.

• Pump the grout into place.

5. Allow the grout to set.

1. Baseplate
2. Shims or wedges
3. Grout
4. Foundation
5. Sleeve
6. Dam
7. Bolt

6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48

hours.

1. Baseplate
2. Grout
3. Foundation
4. Dam
5. Bolt

7. Remove the leveling jackscrews after the grout hardens in order to remove any stress

points.

8. Tighten the foundation bolts.