Goulds Pumps 3700 - IOM User Manual

Page 57

Advertising
background image

Commissioning, Startup, Operation, and Shutdown

• Hardwood block or soft-faced hammer

Also make sure that the final alignment is complete.
Dowel the pump casing to the baseplate pedestals in order to make sure that you maintain the
proper pump position.
1. Drill two holes, one in each casing mounting pad, at the locations provided.

Drill the holes through both the casing mounting pads and the baseplate pedestal, when
possible. This makes it easier to clean the metal chips produced from the drilling and
reaming operations.

NOTICE:
If water-cooled pedestals have been provided, then do not drill through the baseplate
pedestal. Doing so can result in leakage of cooling water.

2. Clean all burrs and metal chips from the holes.
3. Ream the holes with a number 7 taper pin reamer to the proper fit with the taper dowel pins.

Insert the pins deep enough that only the threaded portion is exposed when the pin is fully
seated.

4. Seat the taper pins firmly in the holes with a hardwood block or soft-faced hammer.

NOTICE:
Always remove the dowel pins before removing the casing. Failure to do so can result in
casing damage.

Model 3700, API Type OH2 / ISO 13709 1st and 2nd Ed. / API 610 8/9/10/11th Ed. Installation, Operation, and Maintenance

55

Manual

Advertising