B&B Electronics Zlinx ZP Series User Manual

Page 29

Advertising
background image

Manual Documentation Number: ZP24D-250RM-SR-2508

25

B&B Electronics Mfg Co Inc – 707 Dayton Rd - PO Box 1040 - Ottawa IL 61350 - Ph 815-433-5100 - Fax 815-433-5104 – www.bb-elec.com

B&B Electronics – Westlink Commercial Park – Oranmore, Galway, Ireland – Ph +353 91-792444 – Fax +353 91-792445 – www.bb-europe.com

change.
bit 1 - ReassignChannel –
0 - Coordinator will not

perform Energy Scan to
determine free channel. It
will operate_ on the
channel determined by the
CH parameter.
1 - Coordinator will perform
Energy Scan to find a free
channel, then operate on
that channel.

bit 2 - AllowAssociation –
0 - Coordinator will not

allow any devices to
associate to it.
1 - Coordinator will allow
devices to associate to it.

bits 3 - 7 are reserved

AI ( v1.x80*)

Networking
{Association}

Association Indication. Read
errors with the last association
request:
0x00 - Successful Completion -
Coordinator successfully started
or End Device association
complete
0x01 - Active Scan Timeout
0x02 - Active Scan found no
PANs
0x03 - Active Scan found PAN,
but the
CoordinatorAllowAssociation bit is
not set

0x04 - Active Scan found PAN,
but Coordinator and End Device
are not configured to support
beacons
0x05 - Active Scan found PAN,
but the Coordinator ID parameter
does not match the ID parameter
of the End Device
0x06 - Active Scan found PAN,
but the Coordinator CH parameter
does not match the CH parameter
of the End Device
0x07 - Energy Scan Timeout
0x08 - Coordinator start request
failed_
0x09 - Coordinator could not start
due to invalid parameter
0x0A - Coordinator Realignment
is in progress
0x0B - Association Request not
sent
0x0C - Association Request timed
out - no reply was received
0x0D - Association Request had

0 - 0x13 [read-
only]

-

Advertising