JLG 800A_AJ ANSI Service Manual User Manual

Page 113

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120740

– JLG Lift –

3-57

6. While keeping Thrust Washers in place, slide Cluster

Gear into Carrier with the larger gear on the side
with the small pin hole.

7. Line up Cluster Gear and thrust Washers with hole in

Carrier and slide Planet Shaft through. Line up
chamfered side of hole in Planet Shaft with pin hole
in Carrier.

8. Drive Anti-Roll Pin flush into Carrier hole, thereby

locking Planet Shaft into place.

9. Repeat these steps for remaining two Cluster Gears

to complete Carrier Sub Assembly.

Advertising