11 swing bearing, Turntable bearing mounting bolt condition check, Swing bearing -43 – JLG 800A_AJ ANSI Service Manual User Manual

Page 99

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120740

– JLG Lift –

3-43

3.11 SWING BEARING

Turntable Bearing Mounting Bolt Condition
Check

NOTE: This check is designed to replace the existing bear-

ing bolt torque checks on JLG Lifts in service. This
check must be performed after the first 50 hours of
machine operation and every 600 hours of machine
operation thereafter. If during this check any bolts
are found to be missing or loose, replace missing or
loose bolts with new bolts and torque to the value
specified in the torque chart, after lubricating the bolt
threads with loctite #271. After replacing and
retorquing bolt or bolts recheck all existing bolts for
looseness.

1. Check the frame to bearing attach bolts as follows:

a. Elevate the fully extended upper boom to hori-

zontal. (See Figure 3-34.)

b. At the positions indicated on Figure 3-35. try to

insert a.0015 feeler gauge between the bolt and
hardened washer at the arrow indicated posi-
tion.

c. Ensure that the 0.0015” feeler gauge will not

penetrate under the bolt head to the bolt shank.

d. Swing the turntable 90 degrees, and check

some selected bolts at the new position.

e. Continue rotating the turntable at 90 degrees

intervals until a sampling of bolts have been
checked in all quadrants.

2. Check the turntable to bearing Attach bolts as fol-

lows:

a. Elevate the fully retracted upper boom to full ele-

vation.

b. At the position indicated on Figure 3-33. try to

insert the 0.0015” feeler gauge between the bolt
head and hardened washer at the arrow indi-
cated position.

c. Lower the boom to horizontal and fully extend

the boom.

d. At the position indicated on Figure 3-35., try and

insert the 0.0015” feeler gauge between the bolt
head and hardened washer at the arrow indi-
cated position.

Advertising