Mounting completion – 2N Helios IP Force User Manual
Page 24

24
1.
2.
Normal operation
Default setup
Configuration jumpers X6, PCB version 555v2
Figure:
Mounting Completion
Having connected all the wires, make sure that the bushings, if used, are
tightened properly and the RJ-45 connector is inserted in the PCB connector.
Replace the front cover carefully. Make sure that the connector is inserted
correctly and the wires inside the device leave enough space for the board if you
are installing a four-button board. Tighten the four screws thoroughly with the
wrench enclosed (Torx 20) to make the panel fit tightly to the metal chassis.
Caution
Properly installed intercom is waterproof. An incorrect mounting may
compromise the intercom watertightness. Water leakage may damage the
electronic part of the system.
Stainless steel screws are used for the
assembly.
2N
®
Helios IP Force
Other screws than stainless steel ones corrode soon and may aesthetically
deteriorate the surrounding environment!