3 unpacking and installation, Unpacking and installation, Instrument setup – Leica Biosystems RM2245 User Manual

Page 18

Advertising
background image

16

Instructions for Use V 1.9 RevC - 06/2013

4. Instrument Setup

4.3 Unpacking and installation

Fig. 8

Fig. 9

1

2

3

4

4

4

4

5

• Loosen and unscrew the six upper

screws (2).

• Remove the cover (1).
• Take the accessory carton (optional

accessories) (3) and the cartons (4)

from the standard scope of delivery.

The transport crate and includ-

ed retaining elements should

be kept in case a return ship-

ment is necessary later.

When the instrument is delivered, check the tilt indicators on the

packaging.

If the arrowhead is blue, the shipment was transported laying

flat, was tilted at too great an angle or fell over during transport.

Note this on the shipping documents and check the shipment for

possible damage.

Advertising