Wiring the device, Wiring terminal assignment, Mains – Lenze E94APNExxx4 User Manual
Page 55: Dc bus
![background image](/manuals/565778/55/background.png)
Wiring the device
Wiring
Terminal assignment
l
55
EDK94PNE245 DE/EN/FR/ES/IT 2.0
Mains
Terminal X111
Labelling
Description
^ Fig.5−3
L1
L2
L3
Connection of the mains phases L1, L2, L3
+
C
ti
f
th
l
id PE
d
t
Connection for the supply−side PE conductor
Terminal X112
Labelling
Description
^ Fig.5−3
L1
L2
L3
Alternative connection at the bottom: mains phases L1, L2, L3
+
C
ti
f
th
l
id PE
d
t
Connection for the supply−side PE conductor
Terminal data
Max. conductor cross−section
Tightening torque
Screw drive
[mm
2
]
[AWG]
[Nm]
[lb−in]
Device size 4:
Connection with ring
cable lug M8
50
(2 x 25)
1/0
−
8
71
SW13
Device size 5:
Connection with ring
cable lug M10
120
(2 x 50)
4/0
(2 x 1/0)
15
133
SW15
DC bus
Terminal X111
Labelling
Description
^ Fig.5−3
+UG
−UG
Connection of DC−bus voltage
Cables routed upwards
Terminal X112
Labelling
Description
^ Fig.5−3
+UG
−UG
Connection of DC−bus voltage
Cables routed downwards
Terminal data
Max. conductor cross−section
Tightening torque
Screw drive
[mm
2
]
[AWG]
[Nm]
[lb−in]
Device size 4:
Connection with ring
cable lug M8
70
(2 x 35)
2/0
−
8
71
SW13
Device size 5:
Connection with ring
cable lug M10
150
(2 x 70)
300 mcm
(2 x 2/0)
15
133
SW15