4 wiring of control connections, Wiring of control connections, Wiring the device – Lenze E94APNExxx4 User Manual

Page 57

Advertising
background image

Wiring the device

Wiring

Wiring of control connections

5

l

57

EDK94PNE245 DE/EN/FR/ES/IT 2.0

5.3.4

Wiring of control connections

24 V supply

Terminal X11

Labelling

Description

GE

GND external supply

24E

24 V external supply through safely separated power supply unit
(SELV/PELV)
IEC 61131−2, 19.2 ... 28.8 V, residual ripple max. ±5 %
Current during operation: 1.4 A
Starting current: 4 A for 100 ms

9400SSP000X2

SB

Reserved

Terminal data

Conductor cross−section

Tightening torque

[mm

2

]

[AWG]

[Nm]

[lb−in]

Flexible

0.2 ... 2.5

24 ... 12

Spring terminal

With wire end
ferrule

Stripping length / contact length: 10 mm

Digital inputs, digital outputs

Terminal X12

Labelling

Description

GOI

GND digital out / in

DI1

Activation of brake chopper
(external 24 V supply required)

DO1

Mains OK

DO2

Brake chopper active

DO3

Short circuit in brake chopper

SSP9400X12

DO4

Heatsink overtemperature

Terminal data

Conductor cross−section

Tightening torque

[mm

2

]

[AWG]

[Nm]

[lb−in]

Flexible

0.2 ... 2.5

24 ... 12

Spring terminal

With wire end
ferrule

Stripping length / contact length: 10 mm

Advertising