Commissioning – Lenze TML Flux Vector Drive 0.25kW-2.2kW User Manual

Page 21

Advertising
background image

Lenze 13466187 EDBTL03 v8

EN, DE, FR, IT, ES

19

Commissioning

Code

Possible Settings

IMPORTANT

No.

Name

Lenze Selection

c61

Present status/error

status/error message

• Display

• Refer to Section 5 for explanation

of status and error messages

c62

Last error

error message

c63

Last error but one

c64

Last error but two

c70

Configuration TRIP

reset (error reset)

0

0 TRIP reset after LOW-HIGH change at

terminal 28, mains switching, or after

LOW-HIGH change at digital input “TRIP

reset”

1 Auto-TRIP reset

• Auto-TRIP reset after the time

set in c71

• More than 8 errors in 10 minutes

will trigger

rSt

fault

WARNING!

Automatic starting/restarting may cause damage to equipment and/or injury to

personnel! Automatic starting/restarting should only be used on equipment that

is inaccessible to personnel.

c71

Auto-TRIP reset

delay

0.0

0.0

{s}

60.0

See c70

c73

Input voltage

selection

0 Low (for 200 V input)

• Lenze setting depends on C93

• During commissioning, confirm

correct setting based on mains

voltage

1 High (for 230 V input)

c78

Operating time

counter

Display

Total time in status “Start”

0...999 h: format xxx

1000...9999 h: format x.xx (x1000)

10000...99999 h: format xx.x (x1000)

c79

Mains connection

time counter

Display

Total time of mains = on

c82

S-ramp integration

time

0.0

0.0

{s}

50.0 • c82 = 0.0: Linear accel/decel ramp

• c82 > 0.0: Adjusts S-ramp curve

for smoother ramp

L25

Skip frequency 1

0.0

0.0

{Hz}

240 • L25 and L26 define the start of the

skip range

• L28 defines the bandwidth of the

skip range

L26

Skip frequency 2

0.0

0.0

{Hz}

240

L28

Skip frequency

bandwidth

0.0

0.0

{Hz}

10.0

Note
Bandwidth (Hz) = f

s

(Hz)

+

L28 (Hz) f

s

= L25 or L26

Example:

L25 = 18 Hz and L28 = 4 Hz; the bandwidth = 18...22 Hz

Advertising