Electrical installation – Rockwell Automation 48MS MultiSight Vision Sensor User Manual
Page 8
 
MultiSight™ User Manual
Installation Instructions
8
10000000877(02)
Fine Adjustment
Electrical Installation
Fine adjustment of the MultiSight should not be carried out until 
after electrical connection and start-up (PC software installation) 
(see “Start-up” on page 18).
The electrical installation of the MultiSight must be carried out by 
a qualified electrician.
When installing the MultiSight disconnect all electrical 
components from the power supply.
When the unit is used on a network, make sure that the network 
address (IP address) of the MultiSight set by the manufacturer at 
192.168.100.100 is still free and is not in use by any other unit 
connected to the system.
If necessary, reset the IP address of the MultiSight as described in 
“Network Settings” on page 11.
When the MultiSight is in use, the protective caps supplied must 
be covering the M12 socket (Ethernet) if it is not in use. Failure to 
do this may cause malfunction.
EtherNet/IP models only:
The supplied black PVC M12 covers must be installed around the 
coupling nut of each connection cable (Power-I/O and ethernet) 
to protect from ESD when using standard cables. (There is a 
plastic nut on the MultiSight specific cables to provide this ESD 
protection, so the PVC cover is not required for 48MS-CS-2 and 
48MS-ECSCROSS-3.)
IMPORTANT
ATTENTION
E
Focus Adjustment
LED Indicators
M12 Connection Socket
24 V DC and I/O
M12 Connection Socket ENET
(8-pin on standard models,
 4-pin D-code on EtherNet/IP models)
PWR-I/O
ENET
E