Step 6 (left): connect pe splicing cables – Rockwell Automation 21G PowerFlex 755 Transition Section and Splicing Kit User Manual
Page 13
                                    Advertising
                                    
                                        
                                    
                                
                                 
Rockwell Automation Publication 750-IN027C-EN-P - November 2013
13
PowerFlex 755 Transition Section and Splicing Kit for Floor-mount Drives and CENTERLINE 2100 Motor Control Centers
Step 6 (Left): Connect PE Splicing Cables
1.
Pass the cables through the bottom wireway openings.
2.
Connect the PE splicing cables between the MCC and drive PE bus bars.
1/4-20
7.3 N•m (65 lb•in)
10 mm
➊
➌
➋
1/4-20 x 1 in.
1/4-20 x 1 in.
1/4-20 x 1.25 in.
No.
Description
Hardware
➊
1200A with 25.4 mm (1 in.) bus bar. Requires two splice cables.
See
Table 3
for a list of
required hardware.
➋
2000A with 25.4 mm (1 in.) bus bar. Requires two splice cables.
2000A with 50.8 mm (2 in.) bus bar. Requires three splice cables.
➌
3000A with 50.8 mm (2 in.) bus bar. Requires three splice cables.