Start and Run Boost Settings

The following setup procedure may be used to maximize starting torque
and minimize motor heating. The procedure is written for users who have
the optional Handheld Terminal (HHT) or a Control Panel installed, and
who are not using a 2-wire drive control scheme. For users without the
optional HHT or Control Panel, respective external commands and signals
must be substituted to simulate the operation of the HHT or a Control
Panel.

!

ATTENTION: Become familiar with the equipment and read
through the wiring, speed selection and adjustment sections of the
User Manual before attempting to perform this setup procedure.
Adjustments in this setup procedure will be made under load
conditions with power applied both to the drive and motor.

Exercise extreme care when performing any drive programming.
Failure to do so may result in equipment damage.

Important:

1. Power must be applied to the drive when viewing or changing 1336VT

parameters. Previous programming may effect the drive status when
power is applied.

2. If option L1, L2 or L3 is installed, remote start circuits may be

connected to TB3 on the Interface Board. Confirm that all circuits are in
a de-energized state before applying power.

3. If you cannot complete a procedure, immediately refer to Chapter 10

–– Fault Codes in the User Manual. Do not proceed. Determine the
cause of the problem and correct the problem first, then return to the
startup procedure.