2 - setting up the slc and pc hardware, Required tools and equipment, Install the power supply – Rockwell Automation 1747-L55x,D174710.4 SLC 500 Ethernet User Manual

Page 13: Setting up the slc and pc hardware, Chapter

Advertising
background image

Chapter

2

Publication 1747-10.4

Setting Up the SLC and PC

Hardware

This chapter tells you:

what tools and equipment you need

how to install and wire your power supply

how to install and apply power to your processor

how to configure the SLC 5/05 processor to communicate on the
Ethernet network

Have the following tools and equipment ready:

a medium blade screwdriver

programming equipment

a 1747-CP3 programmer cable, a 10Base-T Ethernet PC card and
a 10Base-T Ethernet hub

Follow the steps below:

1. Align the circuit board of the power supply with the card guides

on the left side of the chassis, and slide the power supply in until
it is flush with the chassis.

Required Tools and
Equipment

Install the Power Supply

Advertising