Rockwell Automation 6186-Mxxx Industrial Monitors User Manual User Manual

Page 17

Advertising
background image

Publication 6186M-UM001J-EN-P - July 2008

17

Installing the Monitor Chapter 2

5. Slide the mounting clips into the slots on the top, bottom, and

sides of the monitor.

6. Tighten the clips by hand in the specified sequence, beginning

with the center clips and continuing to the corner clips.

Repeat this process at least three times until the clips are
hand-tight and the gasket is compressed uniformly against the
panel.

7. Tighten the mounting clips to a torque of 1.1 N•m (10 in-lbs) in

the sequence shown in step 6. Do not over-tighten.

Torque Sequence

8

1

5

7

2

6

4

3

7

1

5

6

2

8

9

3

4

10

1500M and 1700M Monitor

1200M Monitor

10

1

5

13

3

1900M Monitor

12

11

6

2

9

8

7

4

14

Torque Sequence

Torque Sequence

ATTENTION

Tighten the mounting clips to the specified torque to provide a
proper seal and prevent damage to the product. Rockwell
Automation assumes no responsibility for water or chemical
damage to the product or other equipment within the enclosure
because of improper installation.

Advertising