Rockwell Automation 6186-Mxxx Industrial Monitors User Manual User Manual
Page 17

Publication 6186M-UM001J-EN-P - July 2008
17
Installing the Monitor Chapter 2
5. Slide the mounting clips into the slots on the top, bottom, and
sides of the monitor.
6. Tighten the clips by hand in the specified sequence, beginning
with the center clips and continuing to the corner clips.
Repeat this process at least three times until the clips are
hand-tight and the gasket is compressed uniformly against the
panel.
7. Tighten the mounting clips to a torque of 1.1 N•m (10 in-lbs) in
the sequence shown in step 6. Do not over-tighten.
Torque Sequence
8
1
5
7
2
6
4
3
7
1
5
6
2
8
9
3
4
10
1500M and 1700M Monitor
1200M Monitor
10
1
5
13
3
1900M Monitor
12
11
6
2
9
8
7
4
14
Torque Sequence
Torque Sequence
ATTENTION
Tighten the mounting clips to the specified torque to provide a
proper seal and prevent damage to the product. Rockwell
Automation assumes no responsibility for water or chemical
damage to the product or other equipment within the enclosure
because of improper installation.