Rack mounting, Required tools, Mounting guidelines – Rockwell Automation 6186-Mxxx Industrial Monitors User Manual User Manual
Page 18
Advertising
18
Publication 6186M-UM001J-EN-P - July 2008
Chapter 2 Installing the Monitor
Rack Mounting
You can install the 1200M, 1500M, and 1700M monitors directly into a
rack by using the appropriate rack adapters.
Rack Adapters
Required Tools
You need the optional rack-adapter kit and a #2 Phillips screwdriver.
Mounting Guidelines
Observe these guidelines when installing the monitor in a rack.
•
The height of the cabinet must accommodate the monitor’s
panel height.
•
The depth of the cabinet must accommodate the monitor’s
depth plus rear clearance for cables and airflow. A cabinet depth
of 74 mm (2.9 in.) is sufficient.
Cat. No.
Description
6189V-MRA12
Rack adapter for 1200M monitor
6189V-MRA15
Rack adapter for 1500M monitor
6189V-MRA17
Rack adapter for 1700M monitor
Advertising