Figure 23, Deaerating the high pressure pump – Metrohm 850 Professional IC Anion MCS LP-Gradient User Manual

Page 55

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

850 Professional IC – Anion – MCS – LP Gradient

■■■■■■■■

45

5

1

2

6
7

5

3

4

5

Figure 23

Deaerating the high pressure pump

1

Syringe 10 mL 6.2816.020
For aspirating the eluent.

2

Luer connector
On purging needle.

3

Purging needle 6.2816.040

4

Deaerating capillary

5

PEEK pressure screws, short
6.2744.070

6

Purge valve

7

Purge valve rotary knob

1 Connecting the purging needle

Push the end of the purging needle (23-3) over the end of the
deaerating capillary (23-4) on the purge valve.

2 Connecting the syringe

Insert syringe (23-1) in the Luer connector (23-2) of the purging
needle (see Figure 23, page 45)
.

3 Opening purge valve

Open the rotary knob (23-7) by approx.

½ rotation counterclock-

wise.

4 Setting the flow rate

Start MagIC Net (if not yet started).

Ensure that the eluent aspiration tubing is immersed sufficiently in
the eluent.

Let the high pressure pump run.

Advertising