The BMS lets you set up the following hardware:

 BMS-VR:

“Termination Voltages” and “Discharge Loads” can be set.

Settings can be entered directly by selecting the applicable ADJ. checkbox in the list on the i-Trax Charger

Menu or BMS-VR Menu screen, or they can also be specified in the Diagnostic screen. The latter method is

explained below.

1.

Setting the termination voltage

1) Open the Diagnostic screen from BMS-VR Menu screen.

2) Select

“ Discharge Data” in the menu and click “ Load” button.

3) Click Tool(Util), and then select Termination Voltage Setup.

4) The following setup window will open, displaying the current termination voltage

Enter a desired termination voltage within the setting range, and then click OK. The setting will be

recorded in the hardware

2.

Setting the discharge load

1) Open the Diagnostic screen from i-Trax Charger Menu or BMS-VR Menu screen.

2) Select

“ Discharge Data” in the menu and click “ Load” button.

3) Click Tool(Util), and then select Load Value (Watts) Setup.

3) The following setup window will open, displaying the current discharge load.

Enter a discharge load within the setting range, and then click OK. The setting will be recorded in

the hardware