10. Install modules as follows:

a. Put the replacement module in position, and secure with the screw removed previously. Ensure that the washer is

under the head of the screw.

Diode
or IGBT

Round Thermal Pad

Washer

Screw

Art # A-03907

Main PCB

Heatsink

Tape

b. Torque the screw to 17 inch-pounds (1.9 Nm).

CAUTION

Failure to torque properly will cause component damage.

11. Reconnect the wiring per the applicable chart.

From IGBT

Terminals

To Main PCB

Terminals

E28, E29

E13

E32, E33

E15

E30,E31

E35

J18

J20

J19

J21

CutMaster 51

IGBT Wiring Connections

From Output

Diode

E38, E39
E42, E43
E36, E37
E40, E41

E18
E20

Output Diode Wiring Connections

To Main PCB

E21
E19

11. Stand the Power Supply upright.

Re-connect primary input power, and test the unit.

12. When all tests are completed, re-install the power supply cover.