Tweco 51 with SL100SV CutMaster User Manual

Page 41

Advertising
background image

Manual 0-4640

3-17

INSTALLATION

3

3.11 Optional Remote Current Control Harness Installation

1.

Locate the power supply Pot/LED Board just inside the power supply front panel.

Art # A-03964

Pot / LED Board

2.

Disconnect and remove the wire harness between the Pot/LED Board and receptacle J22 on the Main PC Board. Keep the
harness for possible future use.

3.

The kit includes a wire harness with 3 connectors. Install the harness as follows:

To Pot/LED Board
Receptacle J14

To Automation
Interface Board
Receptacle J3

To Main PC Board
Receptacle J27

Connector Plugs

Art # A-03945

4.

Ensure that the wire harness will not interfere with the fit of the power supply cover against the top edge of the power
supply center chassis. Use wire ties as needed to secure the wire harness.

NOTE

Installation of this harness disables the output current control (A) on the front panel of the power supply. Use the
CNC controller to control the output current of the power supply.

5.

Re-install the Power Supply cover.

Advertising