10 automation interface pc board set-up, 10 automation interface pc board set-up -16, Re-install the power supply cover – Tweco 51 with SL100SV CutMaster User Manual

Page 40: Automation interface pc board pilot board, Automation interface pc board, Switches

Advertising
background image

INSTALLATION

3-16

Manual 0-4640

3

3.10 Automation Interface PC Board Set-up

The Automation Interface PC board includes switches that must be set to adapt the Interface Board to the automation system
being used. The switches are factory-set for the Thermal Dynamics SC-11 Standoff Control and require no adjustment.

For operation with any other CNC equipment, refer to the CNC system documents to determine the division factor the CNC
system requires. Proceed as follows:

1.

Set the interface control board switches as indicated in the appropriate chart in the Appendix pages. The division factors
are listed in the right-hand column of each chart.

Art # A-04229

8

7

6

5

4

3

2

1

8

7

6

5

4

3

2

1

Automation Interface

PC Board

Pilot Board

Automation Interface PC Board

Art # A-03757

Switches

8 7 6 5 4 3 2 1

2.

Re-install the Power Supply cover.

Advertising