11 filling master power supply coolant – Tweco Merlin 6000GST Master PS User Manual

Page 30

Advertising
background image

INSTALLATION PROCEDURES

3-10

Manual 0-2652

4. Connect the end of the Pilot Lead, two wires, to the Master

Power Supply as follows:

a. Remove the right side panel from the Master Power

Supply.

b. Feed the Pilot Lead, two wires, through the small strain

relief at the front panel of the Master Power Supply.

c. Remove the nut and star washer on the ground termi-

nal of the pilot connection inside the power supply.

Small Strain

Relief

Black Wire

of Pilot Lead

Ground Terminal

Nut

Star Washer

Pilot Terminal

Red Wire

of Pilot Lead

A-01495

Figure 3-11 Pilot Lead Connection at Power Supply

d. Secure the shield lead (black) to the ground connec-

tion with the nut and star washer removed above.

e. Remove the nut and star washer from the other pilot

connection inside the power supply.

f. Secure the pilot lead (red) to the pilot connection with

the nut and star washer removed above.

5. Connect the Power Lead to the Master Power Supply as

follows:

a. Feed the Power Lead through the large strain relief at

the front panel of the Master Power Supply.

b. Remove the lock nut from the power connection termi-

nal inside the power supply.

Large

Strain Relief

Power Lead

Nut

Power Lead

Terminal Bolt

A-01496

Figure 3-12 Power Lead Connection at Master Power

Supply

c. Remove the power lead terminal bolt.

d. Place the Power Lead ring lug over the existing lug.

e. Secure the power lead to the connection with the bolt

and lock nut removed above.

6. Refer to the Arc Starter Box Manual (0-2654) and the Gas

Control Module Manual (0-2641) to connect the other end
of the Torch Supply Leads components.

7. Refer to the Arc Starter Box Manual (0-2654) and connect

the liquid cooled Maximizer 300 torch to the Arc Starter Box.

NOTE

Refer to the Installation sections in the Maximizer
300 Torch Instruction Manual (0-2642) for more
information on the Torch.

Advertising