06 connect work cable and pilot and negative leads, Ultra-cut 300 – Tweco 300 Ultra-Cut(March 2013) User Manual
Page 32
INSTALLATION
3-8
Manual No. 0-5134
ULTRA-CUT 300
3.06 Connect Work Cable and Pilot and Negative Leads
1. Pass the ends of the work cable and pilot and negative leads upward through the leads bracket at the
bottom edge of the rear panel, then through the openings in the connections cover support panel.
2. Refer to the illustration. Connect the leads as shown. Tighten securely. Do not overtighten.
CAUTION
The clear connections cover must remain in place.
PILO
T
WORK
TORCH
Connection Panel
AC INPUT
L1
L2
L3
Work Lead
Torch Lead - To Remote Arc Starter
Work
Torch
Lead Connection Detail
Connections Cover
Support Panel
Art # A-07660_AB
Connections Cover
Pilot
To Cutting Table
Leads Bracket
Pilot Lead -
To Remote Arc Starter
3. Re-install the connections cover on the power supply. Snug the hardware securely by hand. Do not over-
tighten.