Ultra-cut 300 – Tweco 300 Ultra-Cut(March 2013) User Manual
Page 39
Advertising
Manual No. 0-5134
3-15
INSTALLATION
ULTRA-CUT 300
3. Feed the Fiber Optic Cable plug and wires through the hole where the plastic plug was removed labelled
GCM/DCM and slide the thin nut back over the Fiber Optic Cable.
4. Secure the thin nut on the through hole protector so both nut faces are tight against the sheet metal inside
and out.
5. Plug the Fiber Optic Cable into the PCB as shown below. Make sure the locking tabs are engaged.
Thin nut securing
the through hole
protector
Fiber Optic
Cable
Plug
Art # A-09136
6. Notice the alignment pin and then connect the TSC-3000 cable (V) to the rear of the CCM as shown below.
TSC-3000 Cable
DMC-3000 Fiber
Optic Cable
Art # A-09137
Advertising