Sixth 5, Seventh, Mount bottom case attach strikes attach top case – SARGENT HC8700 Hurricane Code Surface Vertical Rod Exit Device User Manual
Page 5
SIXTH
5
Copyright © 2009-2011, Sargent Manufacturing Company, an ASSA ABLOY Group company.
All rights reserved. Reproduction in whole or in part without the express written permission
of Sargent Manufacturing Company is prohibited.
A6701L
11-30-11
SEVENTH
1. Verify rail is not dogged.
2. Screw rod into bottom case until finger tight.
3. Slide bottom rod into main slide.
4. Insert adjustment pin into
middle hole.
5. Position bottom case on door, centered on vertical reference line.
Raise or lower to achieve gap indicated for strike application
(see drawings below).
6. Drill and tap mounting holes.
7. Mount bottom case. Tighten fasteners securely.
Rod
adjustment
pin
1/4" Min.
1/8"
1/8"
MORTISE APPLIED STRIKES
SURFACE APPLIED
STRIKES
LATCH TRACK THRESHOLDS (BY
OTHERS)
MOUNT BOTTOM CASE
ATTACH STRIKES
ATTACH TOP CASE
(2) #10-24
screws
646
Top Strike
(Panic & Fire Rated)
3-EXPLICIT
(2) #12-24
screws
654
HC- Top Strike
(Panic & Fire Rated)
2-ISOMETRIC
(4) #12-24
screws
TOP STRIKES
Mount
top strike in position.
Tighten screws securely.
Note: Use two (2) No. 10 steel screws and mortise
nuts (when provided) in the position illustrated in
the top case. Steel mortise nuts are twin knurled
for identification.
NOTE: SHIM TOP STRIKE WHEN NECESSARY
TO OBTAIN 1/8" GAP
648
Transom
Panel Strike