Sixth 5, Seventh, Mount bottom case attach strikes attach top case – SARGENT HC8700 Hurricane Code Surface Vertical Rod Exit Device User Manual

Page 5

Advertising
background image

SIXTH

5

Copyright © 2009-2011, Sargent Manufacturing Company, an ASSA ABLOY Group company.

All rights reserved. Reproduction in whole or in part without the express written permission

of Sargent Manufacturing Company is prohibited.

A6701L

11-30-11

SEVENTH

1. Verify rail is not dogged.
2. Screw rod into bottom case until finger tight.
3. Slide bottom rod into main slide.
4. Insert adjustment pin into

middle hole.

5. Position bottom case on door, centered on vertical reference line.

Raise or lower to achieve gap indicated for strike application
(see drawings below).

6. Drill and tap mounting holes.
7. Mount bottom case. Tighten fasteners securely.

Rod

adjustment

pin

1/4" Min.

1/8"

1/8"

MORTISE APPLIED STRIKES

SURFACE APPLIED

STRIKES

LATCH TRACK THRESHOLDS (BY

OTHERS)

MOUNT BOTTOM CASE

ATTACH STRIKES

ATTACH TOP CASE

(2) #10-24
screws

646

Top Strike

(Panic & Fire Rated)

3-EXPLICIT

(2) #12-24
screws

654

HC- Top Strike

(Panic & Fire Rated)

2-ISOMETRIC

(4) #12-24
screws

TOP STRIKES
Mount

top strike in position.

Tighten screws securely.

Note: Use two (2) No. 10 steel screws and mortise

nuts (when provided) in the position illustrated in
the top case. Steel mortise nuts are twin knurled
for identification.

NOTE: SHIM TOP STRIKE WHEN NECESSARY

TO OBTAIN 1/8" GAP

648

Transom

Panel Strike

Advertising
This manual is related to the following products: