Electrical hookup – Great Plains 3PYPA Operator Manual User Manual

Page 20

Advertising
background image

16

3PYPA

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-647M

Table of Contents

Index

03/20/2012

Refer to Figure 4 on page 15
11. Connect the flexible top link

only for field opera-

tions and maintenance (never for transport).

Adjust the top link with the tractor turnbuckle and the
sliding link

.

For field operations, adjust the top link so that it is
slack with the planter lowered, and taut near the top
of hitch travel with the planter raised. The goal is to
reduce the weight borne by the rear lift assist cylin-
ders, and reduce any tendency for the tires to dig on
end-of-pass turns and during backing.

12. Raise tractor 3-point just enough to relieve pressure

from the bases of the parking stands.

Electrical Hookup

Refer to Figure 6
Your 3PYPA planter is equipped with several standard
and optional devices that require separate electrical con-
nections. For future reference, note any optional connec-
tors on this checklist.

Lighting connector (standard)

Monitor connector (standard)

Steering connector (standard)

❑ __________________________
❑ __________________________
❑ __________________________
Make sure tractor is shut down with accessory power off
before making connections.

These connections may be made in any order. The key
requirement is that all connections be made prior to
planter movement.

Note: Consoles and switch control boxes should be

mounted in your tractor cab in a location with easy
access. Route wiring harnesses with enough slack
to allow for tractor movement, especially on articu-
lating tractors.

3

4

Null4:

Figure 6

Connector Identification

25236
25237
25238

1

2

3

1

2

3

Advertising